Mining chrome ore in Oman since 1991
Oman Chromite Company (S.A.O.G) was established in 1991 by Royal Decree No. 65/91 and has mined, processed and marketed chrome ore from the Sohar region ever since.


Three decades of Omani chromite
Since the first ore came out of Al Ghashabi mine in 1993, OCC has opened mine after mine across the region and today runs the full chain itself — exploration, mining, processing and marketing.
In 2022 we produced a record 105,992 tonnes, and in 2025 we sold 89,846 tonnes, the highest sales volume in our history. Our shares are listed on the Muscat Stock Exchange.
Our next chapter is anchored in Area 11-A: a 1,438 km² mining and exploration concession in northern Oman that extends the company’s resource base and its operating life.
To contribute to sustainable development in the Sultanate of Oman by being a highly efficient mining company that produces chrome ore and achieves the highest economic added value.
To be the leading chrome ore mining company in the Sultanate of Oman in reputation and return on investment.
What we stand for
Quality is our continuous commitment
The company motto that shapes how we market, deliver and support our ore.
The chrome market in Oman has gained great importance. We keep pace with global requirements and developments and market our products at the best prices — supporting profitability, government revenue and the continued payment of dividends to shareholders.
To keep successful, long-term business relationships with our customers, after-sales service is one of our top priorities. OCC has put preventive measures in place against all possible after-sales issues.
With different product types and specifications (quality and size), efficient on-time delivery and full information on the ore, our production team is fully geared to meet customer needs.
To satisfy our customers as fully as possible, we continuously improve our products and services to deliver high-quality ore — guided by our motto, “Quality is our continuous commitment”.
From the mountains near Sohar
OCC carries out every mining operation itself.
We drill, blast and haul ore from the Oman mountains near Sohar. The ore is extracted and cleaned before transport, then goes through two crushing stages to reach different sizes.
The site is equipped with a three-deck screening unit, and fines below 5 mm are screened with an advanced screen that separates sizes to each customer’s requirements.

- 01Drilling
Benches are drilled at our mine sites in the mountains near Sohar.
- 02Blasting
Controlled blasting frees the chromite-bearing rock.
- 03Haulage
Ore is loaded and hauled from the pit to processing.
- 04Sorting
Ore is cleaned before transport; X-ray sorting upgrades medium and low grades since 2025.
- 05Two-stage crushing
Two crushing stages reduce the rock to the sizes customers need.
- 06Screening
A three-deck screen separates the fractions; an advanced screen splits fines below 5 mm.
- 07Bagging
Product is packed in strong one-tonne jumbo bags on request.
- 08Delivery
On time, to the agreed specification — with shipping information and after-sales support.
Rooted in North Al Batinah
Our head office, mines, crushing plant and ferrochrome investment are all within reach of Sohar and its port.
- Head officeNational Bank of Oman Building, SoharHead office
- Gulf Alloys & Metals20% stake · low-carbon ferrochrome plant, Sohar FreezoneInvestment
- Crusher & geology centreFizh, Wilayat of LiwaProcessing
- Wadi Al HiltiMining site, SoharMining
- Al BuraimiExploration with Minerals Development OmanConcession
Three decades in the making
Drag or scroll to travel through OCC’s history.
- 1991OCC is established
Royal Decree No. 65/91 founds Oman Chromite Company.
- 1993First ore
Production starts at Al Ghashabi mine.
- 1994Three new mines
Zam 1, RG 12 and RGR 56 begin production.
- 2003Record sales
Sales reach 42,342 tonnes — a record at the time.
- 2005Industry index
OCC shares join the industry index of the Capital Market Authority.
- 2021Mahrah licence
A new mining licence lifts production by 426% to 45,194 tonnes.
- 2022Record production
105,992 tonnes produced; OCC acquires 20% of Gulf Alloys & Metals.
- 2024Area 11-A
Mining concession agreement signed with the Ministry of Energy and Minerals.
- 2025Record sales & ISO
89,846 tonnes sold; certified to ISO 9001, 14001 and 45001.
Integrated management system
As part of our continuous drive to improve operations and apply international ISO standards, OCC has adopted an Integrated Management System policy — and in 2025 the company was certified to ISO 9001, ISO 14001 and ISO 45001.
Looking for quality chrome ore?
Tell us the grade, size and quantity you need — our marketing team will come back to you quickly.




